Infrastructure work carried through delivery.

Selected water and wastewater projects combining funding, design, environmental review, construction management, and inspection.

Contact us

Water and wastewater project experience.

Open each project for funding, scope, role, and delivery details.

Civil engineering plans and technical drawings

Provided grant, environmental, design, and construction management services for a TWDB subsidized loan. The project included 17,000 linear feet of 6, 8, and 12-inch water main improvements with fire hydrants, meters, and mains.

Work also included route surveys, utility coordination, a baseline citywide hydraulic model, and construction services for the first two phases.

Funding source
TWDB
Role
Consultant
Primary scope
17,000 LF

Funding work with measurable impact.

Grant and loan administration is integrated with engineering delivery, not treated as a separate handoff.

City of Caddo Mills

$1.26M Grant secured

Secured for a $3.448 million wastewater treatment and collection system improvements project.

City of Celina

$1.1M Grant equivalent

Delivered through loan payment reductions on a $4.48 million wastewater system improvements project.

Bring us the difficult infrastructure problem.

We will help define the work, identify the path forward, and carry it through delivery.